Friday, March 14, 2014

A Mess Until March

Wow! Things have been a mess! On January 22, the work finally began on our house. We had 3 workers here every day until February 25. A whole month!! Our house was a DISASTER the whole time they were here. All of our furniture was piled into every room they weren't working in except our bedroom. There was dust everywhere. There was paper covering much of the floor. That paper was coated in stripper or stain. It was a yucky, yucky mess. We were unable to use our kitchen or sit in our living room for a month.

Our living room a couple of weeks ago
We actually ended up spending a lot of time at home with the workers. I have completely lost count of how many snow days we have had this winter. There were many days we did not have work and stayed home. My husband stayed home with them for a week after suffering through the beginning of anaphylaxis. If you don't know what that is, it basically means you quit breathing due to an allergic reaction. He didn't quit breathing but he was headed in that direction.

Thankfully we loved our workers. They did an awesome job on our house and they were fun to talk to. We don't have one single complaint. It was kind of sad when they left. It was depressing on the last day when they walked out with their radio. I knew they would not be coming back! They were also quite handy to have around. They helped us figure out that we had a basement full of water due to our sewer backing up.

A week later they saved us from having a completely flooded house. The toilet backed up after I left for work. Water went in the bathroom, bedroom, down the hall and through the ceiling into the basement. Luckily, one of them was in the basement and saw the water pouring through the ceiling. They had a shop vac and they were able to clean it up quickly and call me at work to come home and deal with it. So, on top of everything else that was done we now also have a new sewer line. So, not only was the inside of the house a mess but the outside too!

The giant mole hill in our front yard after getting a new sewer line.


 Finally,  everything is done except the two new toilets we will be getting Sunday because of their contribution to our sewer problems and the new roof on the carport which we can't get until the weather warms up. Believe it or not we are forecast to have MORE snow Sunday night. Today we got new vertical blinds in the living room to prevent having so much sun damage again. We also had the walls refinished in the living room and guest room, new very thin molding added around the ceiling in the family room and guest bedroom, new floor molding added in the family room and downstairs hallway, refinished stairs, kitchen cabinets and molding refinished, painted the kitchen, built in grill repaired, stove hood repaired, basement door repaired, new thresholds leading into all bathrooms, bathroom cabinets refinished, all inside doors to closets, bedroom etc. refinished, and new shower door. My next post well be lots of photos of all the new work that was done.